Impact Assessment of Artificial Recharge Projects Implemented
by Central Ground Water Board

Check dams
S.  No.
Name of State
No. of schemes for which impact assessment done
Artificial Recharge Structures
Impact assessment
1.
Andhra Pradesh
6
Percolation Tanks 4500-5900 Cubic meter runoff water recharged in one year
 
3
Check dams 1000-1250 Cubic meter runoff water recharged in one year
 
1
Combination of recharge pits and lateral shafts 370 Cubic meter runoff recharged in one year
2
Arunachal Pradesh
1
Roof Top Rain Water Harvesting 7000 cubic meter runoff water harvested in one year
3.

Assam
1
Roof Top Rain Water Harvesting 5500 Cubic meter runoff water harvested in one year
4.
Bihar
1
Roof Top Rain Water Harvesting 4700 cubic meter runoff water recharged in one year
5.
Chandigarh
6
Roof Top Rain Water Harvesting 1440-13,000 Cubic meter runoff water recharged in one year
 
1
Rain Water Harvesting through Roof Top & Pavement catchments 34.50 lakhs cubic meter runoff water recharged in one year  
 
1
Recharge Trenches 9.50 lakh cubic meter rainwater runoff recharged in one year
6.
Gujarat
3
Rain Water Harvesting through Roof Top & Pavement catchments 11000-45000 runoff water recharged in one year
7.
Haryana
1
Roof Top Rain Water Harvesting 2350 Cubic meter runoff water recharged in one year
 
1
Combination of Recharge shafts and injection wells 3.50 lakh cubic meter runoff water recharged in one year. Declining rate reduced from 1.175 m/yr to 0.25 m/yr.
8.
Himachal Pradesh
3
Check dams 1.20-21.00 lakhs cubic meter runoff water recharged in one year.
9.
Jammu and Kashmir
2
Roof Top Rain Water Harvesting 300-1200 Cubic meter runoff water harvested in one year
10.
Jharkhand
1
Roof Top Rain Water Harvesting 4500 cubic meter runoff water recharged in one year.
11.
Karnataka
1
Combination of Percolation Tanks, Watershed Structures, Recharge wells, Roof Top Rain Water Harvesting 2-3.5 m. rise in water levels and 9-16 ha area benefited from percolation tanks 8.60 lakh cubic meter water recharged through recharge well. 3-5 m rise in ground water levels through watershed structures. 530 cubic meter recharged from Roof Top Rain Water Harvesting.  
12.
Kerala
1
Sub-surface Dyke Augmented 5000 Cubic meter of ground water in upstream side with 2 m rise in groundwater levels.
 
1
Recharge wells 2800 Cubic meter runoff water recharged in one year
 
3
Percolation tanks 2000-15000 Cubic meter runoff water recharged in one year
 
1
Tidal regulator 4000 Cubic meter runoff water conserved and a difference of 1.5 m was observed in upstream and downstream water level.
 
1
Check Dam 30,000 Cubic meter runoff water recharged in one year
13.
Lakshdweep
1
Roof Top Rain Water Harvesting 300 Cubic meter rainwater harvested in one year
14.
Madhya Pradesh
4
Sub-surface Dykes Rise in water level in dug wells in the range of 0.80-3.80 m and 6-12 m in hand pumps have been observed.
 
1
Percolation Tank Rise in ground water levels by 1-4 m. in command areas downstream of tanks has been observed.
 
1
Roof Top Rain Water Harvesting (1000 houses) More than 2 lakh cubic meter runoff water recharged in one year.
 
1
Combination of sub-surface dykes and check dam Rise in water levels in existing tubewells in upstream area by 0.30 m to 2.00 m has been observed.
15.
Maharashtra
2
Roof Top Rain Water Harvesting System 196-280 cubic meter runoff water recharged in one year
 
1
Combination of Percolation Tanks and Check Dams. Benefited area About 60 to 120 ha. per Percolation Tank,
3 to 15 hectare per Check Dam
Water level rise Upto 1.5 m.
 
1
Percolation tanks, Recharge Shaft, Dugwell Recharge.
Benefited area 400-500 hectare around the scheme.
16.
Meghalaya
1
Roof Top Rain Water Harvesting 6800 cubic meter runoff water harvested in one year
17.
Mizoram
1
Roof Top Rain Water Harvesting 50,000 cubic meter runoff water harvested in one year
18.
Nagaland
2
Roof Top Rain Water Harvesting 3700 12,800 cubic meter runoff water harvested in one year
19.
NCT Delhi
2
Check dams Water levels have risen upto 2.55 m in the vicinity of Check Dams and area benefited is upto 30 hectare from each check dam in JNU & IIT.
1.30-lakh cubic meter of rainwater was recharged in one year in Kushak Nala.
 
7
Roof Top Rain Water Harvesting 800 5000 Cubic meter runoff water recharged in one year
 
8
Rain water harvesting through Roof Top & Pavement catchments 8500 20,000 cubic meter runoff water recharged in one year
20.
Orissa
1
Rain water harvesting through Roof Top & Pavement catchments 19,000 cubic meter runoff water recharged in one year
21.
Punjab
1
Roof Top Rain Water Harvesting 500 cubic meter runoff water recharged in one year
 
3
Recharge wells 9 15.50 lakhs cubic meter runoff water recharged in one year.
 
1
Trenches Average rise in water level to 0.32-0.70 m has been observed.
 
2
Combination of vertical shafts, injection wells & recharge trenches Recharge of 1.70 lakh cubic meter runoff water caused average rise of 0.25 m. in ground water levels around the scheme area.
 
1
Combination of recharge shafts and injection wells 14,400 Cubic meter runoff water recharged in one year.
22.
Rajasthan 88,000 Cubic meter runoff water recharged in one year. Water level rise - 0.65 m.

1

 
12
Roof Top Rain Water Harvesting 350-2800 Cubic meter runoff water recharged in one year.
 
3
Sub-surface Barriers 2000-11500 Cubic meter runoff water recharged in one year.
Water level rise from 0.25 to 0.60 m.
23.
Tamil Nadu
1
Sub-surface Dyke 39.25 ha. area benefited.
 
7
Percolation Tanks 10,000-2,25,000 runoff water recharged in one year.
 
1
Roof Top Rain Water Harvesting 3700 cubic meter runoff water recharged in one year
24.
Uttar Pradesh
5
Roof Top Rain Water Harvesting 350-1100 cubic meter runoff water recharged in one year
25.
West Bengal
1
Combination of Farm Ponds, Nala Bunds, Sub-surface Dykes Water level rise of 0.15 m. observed.
 
1
Sub-surface Dykes Rise in water levels by 0.45 m. observed
   

 

 

 
         
Home|Tenders | Download | Recruitments | Related links  | About us | Contact us | Feedback


Developed by NIC, New Delhi and National Data Center, CGWB, Faridabad
email:
cgwb@nic.in   Tel: +91-129-2419106   Fax: 91-129-2412524

Best Viewed in IE 5+ with 800x600 resolution & text size medium