Impact Assessment of Artificial Recharge Projects Implemented by CGWB during IX plan.

S. No.

Name of State

No. of schemes for which impact assessment done

Artificial Recharge Structures

Impact assessment

1.

 

 

Andhra Pradesh

6

Percolation Tanks

4500-5900 Cubic meter runoff water recharged in one year

3

Check dams

1000-1250 Cubic meter runoff water recharged in one year

1

Combination of recharge pits and lateral shafts

370 Cubic meter runoff recharged in one year

2

Arunachal Pradesh

1

Roof Top Rain Water Harvesting

7000 cubic meter runoff water harvested in one year

3.

 

Assam

1

Roof Top Rain Water Harvesting

5500 Cubic meter runoff water harvested in one year

4.

Bihar

1

Roof Top Rain Water Harvesting

4700 cubic meter runoff water recharged in one year

5.

Chandigarh

6

Roof Top Rain Water Harvesting

1440-13,000 Cubic meter runoff water recharged in one year

1

Rain Water Harvesting through Roof Top & Pavement catchments

34.50 lakh cubic meter runoff water recharged in one year

1

Recharge Trenches

9.50 lakh cubic meter rainwater runoff recharged in one year

6.

Gujarat

3

Rain Water Harvesting through Roof Top & Pavement catchments

11000-45000 runoff water recharged in one year

7.

Haryana

1

Roof Top Rain Water Harvesting

2350 Cubic meter runoff water recharged in one year

1

Combination of Recharge shafts and injection wells

3.50 lakh cubic meter runoff water recharged in one year. Declining rate reduced from 1.175 m/yr to 0.25 m/yr.

8.

Himachal Pradesh

3

Check dams

1.20-21.00 lakhs cubic meter runoff water recharged in one year.

9.

Jammu and Kashmir

2

Roof Top Rain Water Harvesting

300-1200 Cubic meter runoff water harvested in one year

10.

Jharkhand

1

Roof Top Rain Water Harvesting

4500 cubic meter runoff water recharged in one year.

11.

Karnataka

1

Combination of Percolation Tanks,
Watershed Structures,
Recharge wells, Roof Top Rain Water Harvesting

2-3.5 m. rise in water levels and 9-16 ha area benefited  from percolation tanks
8.60 lakh cubic meter water recharged through recharge well.
3-5 m rise in ground water levels through watershed structures.
530 cubic meter recharged from Roof Top Rain Water Harvesting.

12.

Kerala

1

Sub-surface Dyke

Augmented 5000 Cubic meter of ground water in upstream side with 2 m rise in groundwater levels.

1

Recharge wells

2800 Cubic meter runoff water recharged in one year

3

Percolation tanks

2000-15000 Cubic meter runoff water recharged in one year

1

Tidal regulator

4000 Cubic meter runoff water conserved and a difference of 1.5 m was observed in upstream and downstream water level. 

2

Check Dam

5,100  - 30,000 Cubic meter runoff water recharged in one year

13.

Lakshadweep

1

Roof Top Rain Water Harvesting

300 Cubic meter rainwater harvested in one year

14.

Madhya Pradesh

4

Sub-surface Dykes

Rise in water level in dugwells in the range of 0.80-3.80 m and 6-12 m in hand pumps has been observed.  

1

Percolation Tank

Rise in ground water levels by 1-4 m. in command area downstream of tank has been observed.

1

Roof Top Rain Water Harvesting (1000 houses)

More than 2 lakh cubic meter runoff water recharged in one year.

1

Combination of sub-surface dykes and check dam

Rise in water levels in existing tubewells in upstream area by 0.30 m to 2.00 m has been observed.

15.

Maharashtra

2

Roof Top Rain Water Harvesting System

196-280 cubic meter runoff water recharged in one year

1

Combination of Percolation Tanks and Check Dams.

 

 

Benefited area –
About 60 to 120 ha. per Percolation Tank,
3 to 15 hectare per Check Dam
Water level rise – Upto 1.5 m.

1

Percolation tanks, Recharge Shaft, Dugwell Recharge.

Benefited area – 400-500 hectare around the scheme.

16.

Meghalaya

1

Roof Top Rain Water Harvesting

6800 cubic meter runoff water harvested in one year

17.

Mizoram

1

Roof Top Rain Water Harvesting

50,000 cubic meter runoff water harvested in one year

18.

Nagaland

3

Roof Top Rain Water Harvesting

2,480 – 14,065 cubic meter runoff water harvested in one year

19.

NCT Delhi

2

Check dams

Water levels have risen upto 2.55 m in the vicinity of Check Dams and area benefited is upto 30 hectare from each check dam in JNU & IIT.
1.30-lakh cubic meter of rainwater was recharged in one year in Kushak Nala.

7

Roof Top Rain Water Harvesting

800 – 5000 Cubic meter runoff water recharged in one year

8

Rain water harvesting through Roof Top & Pavement catchments

8500 – 20,000 cubic meter runoff water recharged in one year

20.

Orissa

1

Rain water harvesting through Roof Top & Pavement catchments

1,200 cubic meter runoff water recharged in one year

1

Renovation of creeks & sub - creeks, Construction of Control Sluices and recharge bore wells

Quantity of fresh water impounded in 798119 cubic metres and irrigation potential is 11000 has in a year. 

21.

 

 

 

 

Punjab

1

Roof Top Rain Water Harvesting

500 cubic meter runoff water recharged in one year

3

Recharge wells

9 – 15.50 lakhs cubic meter runoff water recharged in one year.

1

Trenches

Average rise in water level upto 0.32-0.70 m has been observed.

 

Combination of vertical shafts, injection wells & recharge trenches

Recharge of 1.70 lakh cubic meter runoff water caused average rise of 0.25 m. in ground water levels around the scheme area.

1

Combination of recharge shafts and injection wells

14,400 Cubic meter runoff  water recharged in one year.

22.

Rajasthan

1

Check dams

88,000 Cubic meter runoff water recharged in one year. Water level rise - 0.65 m.

12

Roof Top Rain Water Harvesting

350-2800 Cubic meter runoff water recharged in one year.

3

Sub-surface Barriers

2000-11500 Cubic meter runoff water recharged in one year.
Water level rise from 0.25 to 0.60 m.

23.

Tamil Nadu

1

Sub-surface Dyke

39.25 ha. area benefited.

7

Percolation Tanks

10,000-2,25,000 runoff water recharged in one year.

1

Roof Top Rain Water Harvesting

3700 cubic meter runoff water recharged in one year

24.

Uttar Pradesh

7

Roof Top Rain Water Harvesting

350-23033 cubic meter runoff water recharged in one year

25.

West Bengal

1

Combination of Farm Ponds, Nala Bunds, Sub-surface Dykes

Water level rise of  0.15 m. observed.

1

Sub-surface Dykes

Rise in water levels by 0.45 m. observed

 
         
Home|Tenders | Download | Recruitments | Related links  | About us | Contact us | Feedback


Developed by NIC, New Delhi and National Data Center, CGWB, Faridabad
email:
cgwb@nic.in   Tel: +91-129-2419106   Fax: 91-129-2412524

Best Viewed in IE 5+ with 800x600 resolution & text size medium